Ashghal Opens 5km Expressway on Street 33 with New Interchanges
أشغال تفتتح طريق سريع بطول 5 كم في شارع 33 مع تقاطعات جديدة
Ashghal
Public Works Authority ‘Ashghal’ announces the inauguration of Street 33 in Industrial Area with a length of 5km after upgrading and converting it into an expressway, thereby providing seamless traffic flow from East Street 33 Interchange and Industrial Area Road reaching West Industrial Street.
The lanes of Street 33 have been increased from 3 lanes in all directions to 4 lanes in all directions to accommodate 16,000 vehicles per hour. Additionally, two new interchanges with two levels were constructed to connect Street 33 with Al Kassarat Street and West Industrial Street instead of the existing roundabouts.
Street 33 is integrated with Industrial Area Road to reach traffic coming from Doha towards Industrial Area, including several streets and vital roads such as East Industrial Street, Al Kassarat Street, West Industrial Street facilitating reaching Salwa Road and G-Ring Road.
Street 33 will provide substantial traffic flow between the north and south of the Industrial Area and New Industrial Area through its direct connection to main local streets such as Al Karajat Street, Al Manajer Street, Al Banaa Street and Al Taqa Street.
Two new interchanges
Street 33 Interchange with Al Kassarat Street
The old roundabout connecting Al Kassarat Street with Street 33 was removed and a two-level interchange was constructed instead. The interchange contains traffic signals to distribute traffic in all directions, in addition to an overpass above the traffic signals which provides free traffic flow along Street 33.
The new interchange is a major link to those coming and going from Doha towards Al Kassarat Street, and serves many vital, commercial and industrial facilities in the area, particularly as Al Kassarat Street extends from the north to the south of Industrial Area connecting Street 1 and Street 52.
Street 33 Interchange with West Industrial Street
The old roundabout that connects West Industrial Street with Street 33 was removed and a two-level interchange was constructed instead, which will include traffic lights to distribute traffic in all directions in addition to an overpass above the traffic light along Street 33 to provide free traffic flow.
The new interchange is considered an important link for those coming from Doha in the direction of West Industrial Street, or coming from Bu Sidra Interchange on Salwa Road, or from Bu Silla Interchange on G-Ring Road, in the direction of the Industrial Area via Street 33 and vice versa, to serve many vital, commercial, and industrial facilities in the area particularly since the West Industrial Street extends between Salwa Road and G-Ring Road. The new interchange will also facilitate traffic in the direction of Al Taqa Street which also connects Salwa Road at Al Sailiyya interchange and F Ring Road at Al Bahiya interchange.
Service facilities
A new infrastructure for water, electricity and telecommunications systems and water lines for green spaces irrigation were also constructed, and the sewage and rainwater drainage systems were upgraded.
Eng. Bader Darwish, Manager of Highway Projects Department confirmed that the Industrial Area is a priority to ‘Ashghal’ due to its strategic importance, as many of the roads it serves have been upgraded, such as Industrial Area Road, G-Ring Road, East Industrial Street and West Industrial Street, in addition to the various local roads that aim to fully upgrade the Industrial Area, noting that Street 33 serves many economical and industrial facilities in the area, with Street 33 being the main link between East and West of the Industrial Area.
Meanwhile Eng. Nouh Al Joof from the Highway Projects Department said that 80% of the project’s works relied on national and locally manufactured materials such as lighting bulbs and poles, directional signs, sewage and rainwater drainage pipes, asphalt, and prefabricated manholes in addition to concrete and steel.
“Street 33 will improve traffic to and from the Industrial Area as the upgrade work will increase the road’s capacity while achieving an uninterrupted traffic flow due to the new interchanges, providing greater traffic flow along the street, and distributing traffic through the two traffic signals on Al Kassarat and West Industrial Streets”, he added.
أشغال
أعلنت هيئة الأشغال العامة (أشغال) عن افتتاح شارع 33 بالمنطقة الصناعية بطول أعمال حوالي 5 كيلومترات بعد تطويره وتحويله إلى طريق سريع ليوفر تدفقاً مرورياً حراً من تقاطع 33 الشرقي على شارع الصناعية الشرقي وطريق المنطقة الصناعية وصولاً لشارع الصناعية الغربي.
وذكرت الهيئة – في بيان – أنه تم زيادة عدد مسارات شارع 33 من ثلاثة مسارات في كل اتجاه إلى أربعة مسارات في كل اتجاه ليستوعب نحو 16 ألف مركبة في الساعة، هذا إلى جانب إنشاء تقاطعين جديدين من مستويين يربطان شارع 33 مع كل من شارع الكسارات وشارع الصناعية الغربي بدلاً من الدوارين الحاليين.
أعلنت هيئة الأشغال العامة (أشغال) عن افتتاح شارع 33 بالمنطقة الصناعية بطول أعمال حوالي 5 كيلومترات بعد تطويره وتحويله إلى طريق سريع ليوفر تدفقاً مرورياً حراً من تقاطع 33 الشرقي على شارع الصناعية الشرقي وطريق المنطقة الصناعية وصولاً لشارع الصناعية الغربي.
وذكرت الهيئة – في بيان – أنه تم زيادة عدد مسارات شارع 33 من ثلاثة مسارات في كل اتجاه إلى أربعة مسارات في كل اتجاه ليستوعب نحو 16 ألف مركبة في الساعة، هذا إلى جانب إنشاء تقاطعين جديدين من مستويين يربطان شارع 33 مع كل من شارع الكسارات وشارع الصناعية الغربي بدلاً من الدوارين الحاليين.
ويتكامل شارع 33 مع طريق المنطقة الصناعية ليصل الحركة القادمة من الدوحة في اتجاه المنطقة الصناعية وعدد من الشوارع والطرق الحيوية الأخرى مثل شارع الصناعية الشرقي وشارع الكسارات وشارع الصناعية الغربي ليسهل الوصول إلى كل من طريق سلوى من جهة والطريق الدائري السابع من جهة أخرى.
كما سيحقق شارع 33 انسيابية مرورية كبيرة بين شمال وجنوب المنطقة الصناعية والمنطقة الصناعية الجديدة من خلال اتصاله المباشر مع شوارع رئيسية محلية مثل شارع الكراجات وشارع المناجر وشارع البناء وشارع الطاقة.
وتم إزالة الدوار القديم الذي يربط شارع الكسارات مع شارع 33 وإقامة بدلاً منه تقاطع من مستويين، والذي سيحتوي على إشارة ضوئية لتوزيع الحركة المرورية في كافة الاتجاهات إلى جانب جسر علوي يمر من فوق الإشارة الضوئية ليوفر تدفقاً مرورياً حراً على طول شارع 33.
كما تم إزالة الدوار القديم الذي يربط شارع الصناعية الغربي مع شارع 33 وإقامة بدلاً منه تقاطع من مستويين، والذي سيحتوي على إشارة ضوئية لتوزيع الحركة المرورية في كافة الاتجاهات إلى جانب جسر علوي يمر من فوق الإشارة الضوئية على طول شارع 33 ليوفر تدفقاً مرورياً حراً.
وقال المهندس بدر درويش، مدير إدارة مشروعات الطرق السريعة، في أشغال: المنطقة الصناعية تأتي ضمن أولويات “أشغال” نظراً لأهميتها الاستراتيجية حيث تم تطوير العديد من الطرق التي تخدمها مثل طريق المنطقة الصناعية والطريق الدائري السابع وشارع الصناعية الشرقي وشارع الصناعية الغربي بالإضافة إلى الطرق المحلية المختلفة التي تستهدف تطوير المنطقة الصناعية بشكل كامل، كما أن شارع 33 يخدم العديد من المرافق الاقتصادية والصناعية في المنطقة حيث يعتبر شارع 33 حلقة وصل رئيسية تصل بين شرق وغرب المنطقة الصناعية.
وقال المهندس نوح الجوف، من إدارة مشروعات الطرق السريعة، إنه تم الاعتماد على مواد وطنية ومحلية الصنع في أعمال المشروع بنحو 80% مثل أعمدة ومصابيح الإنارة واللوحات الإرشادية وأنابيب الصرف الصحي وتصريف مياه الأمطار والاسفلت والمناهل مسبقة الصنع بالإضافة إلى الخرسانة والحديد المسلح.
ونوه الجوف إلى أن شارع 33 سيعمل على تحسين الحركة المرورية من وإلى المنطقة الصناعية، حيث ستساهم أعمال التطوير على زيادة السعة الاستيعابية للطريق مع تحقيق انسيابية أكبر بفضل التقاطعين الجديدين حيث سيوفران تدفقاً مروريا حرا على طول الشارع مع توزيع الحركة المرورية من خلال الإشارتين الضوئيتين على كل من شارع الكسارات وشارع الصناعية الغربي.